Alternatives for Coastal Development
Coastal Services Center
Nancy Cofer-Shabica, David dosReis, Shan Burkhalter, Jeff Adkins
North Inlet-Winyah Bay NERR Coastal Training Program
December 8, 2005
NOAA Coastal Services Center
Local in approach, national in scope
Mission
To build capacity for informed decision making about our coasts
NOAA Coastal Services Center
Capabilities and Activities
- Training and education
- Data and information
- Tools and techniques
- Communication and coordination
Partners
State and local coastal resource managers, coastal planners, educators, regulatory agencies, fish and wildlife agencies, estuarine reserves, sea grant programs, nongovernmental and nonprofit organizations
Overview
Balancing environmental, community, and economic factors in decision making about the use, development, and conservation of coastal lands and resources.
Overview
Factors facing coastal communities
Sprawl fragments forest, wetlands, and coastal habitat
Impervious surfaces degrade water quality
Tourism can lead to overuse of sensitive areas
Coastal development increases community vulnerability to hazards
Overview
2000
Overview
Partners:
Georgia Coastal Program Georgia Conservancy Coastal Services Center City of St. Marys, Georgia
Overview
Open Space
the Scenarios
Why Protect and Preserve Open bpace?
What Can Do?
References and Resources
Key components:
• Maps of three scenario designs
• 3-D views
• Indicator comparisons across the scenarios
• Project methodology
• Wealth of background information
www. csc. noaa. gov/alternatives
Overview
Conventional
Conservation
New Urbanist
Conventional Site Plan
Overview
acres
• 85 acres reserved as open space
• Total floor area at build-out ~2,293,650 ft2
: 200 4oo oulToo: meters
• 857 single-family residential units
• 100 multifamily residential units
• Average single-family residential lot size ~0.61
Conservation Site Plan
Overview
• 720 single-family residential units
• Average residential lot size ~0.2 acres
• 469 acres preserved as open space
meters
WATERSRONT RESTAURANT
• Total floor area at build-out ~1,079,750 ft2
New Urbanist Site Plan
Overview
• 867 single-family residential units
• 70 multifamily residential units
• Average single-family residential lot size ~0.18 acres
• 445 acres reserved as open space
' ■ \ I fy
■ uOl1 meters
• Total floor area at build-out ~1,596,125 ft2
Overview
Estimated Potential Net Revenue
$48,000,000
$46,000,000
$44,000,000
$42,000,000
$40,000,000
$38,000,000
$36,000,000
Conventional Conservation New Urbanist
$34,000,000
Overview
Alternatives for Coastal Development: One Site, Three Scenarios
Indicator
Open Space Indicator Information
Open S|>
ace
Percent ot Site Total Acres Natural acres Managed acres
In the Scenarios I Why Protect and Preserve Open Space? I What Can I Do? I References and Resources
Related Indicator Information
► Open Space ► Vegetated Buffers ► Clearing Costs
► Runoff ► Walkabilitv ► Impervious Surface
► Water Consumption ► Net Revenue Calculation
In the Scenarios
Open space is any piece of land that has been set aside to remain undeveloped Open space exists in a variety of forms including preserved forests and marshfront areas as well as managed natural areas such as playgrounds, ball fields, and parks. In the scenarios, the open space indicator measures three things: total open space, natural open space, and managed open space. "Natural” refers to the open space in each scenario that is preserved in its undisturbed or natural state. Conversely, "managed" refers to open space whose existing vegetation has been altered or cleared
Why Protect and Preserve Open Space?
Open space protection is a growing concern in American society. The US Department of Housing and Urban Development reports that, "Land is being developed at twice the rate of population growth ” As land is developed, open space near existing jurisdictions and towns is consumed.
Perhaps the most obvious benefit of open space is that it improves people's quality of life by providing recreational opportunities. Open space frequently preserves natural, scenic landscapes while enhancing community charm and character. Surveys have shown that quality of life attracts businesses to communities. In fact, quality of life was rated the third most important factor by chief executive officers in deciding where to locate their businesses (NPS 1995).
Studies have also shown that open space can increase property values. The Trust for Public Lands (TPL) and National Park Service provide many examples of communities whose property values increased due to their proximity to open space. For example, a cluster development in New York that preserved 97 acres of natural wooded environment is benefiting from its open space. One developer commented, "'It may not be the woods that bring (buyers) to us initially, but it seems to make all the difference when they see what it's like” (NPS 1995).
• Partner workshops
Methodology
• Import to GIS
• Indicator development in CommunityViz
• Pollutant runoff with SGIndex SG Water Module
• 3-D views in Visual Nature Studio
• Expert consultation and review
• Base maps
Methodology
• Scenario drawings
File
Edit View Insert Selection Tools Window Help
Methodology
Parcel Layout
+ □ Docks
- 0 Docks
- 0 Project Boundary
□ Conventional Parcel Layout
- -'E
Lorrre-i'a:
I I Community Facility
Future Development
• ar na
ra Marsh
I I Open Space - Natural
Open Space - Park
lH Parking - Unpaved
I I Residential
Roads
’Water
Digitized drawings georeferenced and viewed in ESRI ArcView software
- 0
landcover
land cover
nar time rarest
maritime forest edge
maritime forest hammock
land cover
palustrine forest
palustrine forest
■a--::o', e-
W'alking Trails
Conservation Parcel Layout
- 0
B -:e -'at"
- 0 Roads
- 0 Walking Trails
+ 0 subset_pointpeter.tif
Display Source
-rarer.: _ Iol _ ■ eta-:
GIS Tools
ESRI ArcView in conjunction with:
• SGIndex SG Water Module
• Visual Nature Studio
• CommunityViz
SG WATER
Smart Growth Water Assessment Tool for Estimating Runoff
version 1.0 (Beta)
A product of
United States Environmental Protection Agency
Development, Community, and Environment (1808T)
Washington, DC 20460
Prepared by
Hi assodi on with
GKY and Associates, Inc. Fairfax, Virginia
Sprmgneld, Virginia
GIS Tools
VISUAL-
NATURE
S i LTOTO
bib 12
ESRI ArcView in conjunction with:
• SGIndex SG Water Module
• Visual Nature Studio
• CommunityViz
- ArcViewGIS 3.3
Indicator
Development
File Edit View Jheme Analysis Surface Image Analysis Graphics CommunifyViz Window Help
iw»nj,--rtai®iQioigT7ra^ mapjzi
- Scenario newurb
Scenario conventional
VI 25 ft Buffer
Docks
100ft. Buffer
Newroads_v2
_| New Urbanist Parcel
Trails
** Newparcels_v Commercial Community Fa Marina ^ Marsh
[~H Open Space -1 ■ Open Space -1 | Residential I I Roads
FEMA Flood Zone -
Vi Pp_naturalcolor.img
Vl Docks
100 ft Buffer
25 ft. Buffer
Parcels_cs | Commercial I Community Fac
■ Marina ^ Marsh
~~| Open Space - h
■ Open Space - F ^ Parking - Pavec
I Residential
■ Roads
■ Water Parking
Unpa
Docks_cm
25 ft Buffer
100 ft Buffer
FEMA Flood Zone - 1
Trials
Roads
Trails
Roads
Pp_naturalcolor.img
Parcels - conventic Commercial Community Fac
■ Marina ^ Marsh
~~| Open Space - N
■ Open Space - P ^ Parking - Pavec
I Residential
■ Roads
| | Water
Conventional Parcels
Pp_naturalcolor.img
Indicator Development
Tools Used:
•ESRI ArcMap 9 (ArcInfo) •CommunityViz 9.X Scenario 360
Indicator:
•Calculated value that represents the impacts and outcomes of scenario
Need to specify a series of values:
•User inputs •Indicator formulas
New Urbanist
BE®
File Edit View Insert Selection Tools Window Help
Topology
* 1:24,000
Spatial Analyst
- Jpti Base Scenario
+ 0 New Urbanist Parcels
0 Roads
+ 0 Trails
+ 0 Docks
+ 0 Point Peter
i-Active Scenario
| Base Scenario
Modify
Assumptions Start Edit Attributes
View
Visualize
Reports Diagram
Present
Compare Saved Views
Scenarios
360 Analysis
Selection
Drawing
■r [TO •» B I II A ■>
449336.59 3401749.33 Meters
Alternativesfor Coastal Development
Model Inputs
• Values used as input to an analysis
• Expression of subjective input (weighting)
•Apply to entire scenario
Alternativesfor Coastal Development
Indicator Development
•Developed through Formula Wizard
•Combines user inputs and attribute values from geographic information system (GIS) files
Variable Source
Economic Indicators
Description of Methods
Formula
Algebraic Description
Community
Viz
Rural
3-D Visualization
Scenario Comparison
’ Village
Village
Active Scenario
Modify
Assumptions Start Edit Attributes
Indicators
Charts
_
Visualize
Village
Village
View
Reports Diagram
Saved Views
Compare
Scenarios
■' '' '
Conventional Design
3-D Visualization
Conservation Approach
New Urbanist Design
•'A
—
V Still Image
* Waterfront ▼ Comparison
Project Site
Environmental
Environmental Indicator
Open Space (percent of site)
Vegetated Buffer
Docks
Paths, Trails, and Sidewalks
0 Project Boundary
0 Landcover - Sensitive Resources
maritime forest
palustrine forest
5a
Water Consumption
Impervious Surface Percentage (of
total site) Pollutant Runoff
Indicator Development
Open Space Indicator
Data Layer: Parcels Parcels Attributes:
• Land Use
“Open Space - Natural” “Open Space - Managed
Conventional
Conservation
New Urbanist
• Acres (number of)
Indicator Development
Docks as an Indicator
Data Layer: Docks - Total # Dock Attributes:
• Length (linear ft.)
• Area (sq. ft.)
Conventional
Conservation
New Urbanist
Indicator Conventional Conservation New Urbanist Description
Docks ftotal number/DU) Total number of docks
104/957 4/720 4/937 per dwelling units
Indicator
Conventional Conservation New Urbanist
Total dock length {feet)
Total linear feet of all docks in each scenario and total area covered by docks.
Total dock area (feet2)
*Impervious surface coefficients for varying land uses/densities from literature
Indicator Development
Vegetated Buffer Indicator
Data layer: Water bodies or proxy
Data layer: Parcels Parcels attributes:
• Land use
Conventional
Conservation
“Open space - Natural” “Open space - Managed”
New Urbanist
Indicator Development
Paths, Trails, and Sidewalks Indicator
Data layer: Paths and Trails Path and Trail layer attributes:
• Length
• Width
• Surface type
“Asphalt”
“Concrete”
Conventional
Conservation
New Urbanist
“Mulch”
Indicator
Conventional Conservation New Urbanist
Description
Paths, Trails, and Sidewalks
Total (linear feet)
Impervious
Pervious
32.159
32.159 0
78,846
26,946
51,900
127,134
78,859
48,275
Total length of trails found in each scenario with the total broken into total pervious and impervious lengths
Indicator Development
Conventional
Conservation
New Urbanist
Impervious Surface Indicator
Data layer: Parcels Parcels attributes:
• Land use
• Acres
Conventional Conservation New Urbanist
Percentage of Total Site 26% 12% 18%
Total Impervious Acres 169 82 119
Indicator Development
@ Alternatives For Coastal Development: One Site, Three Scenarios: Impervious Surface Values and Sources - Netscape
Impervious Surface Values and Sources
Land Use
Percent Impervious Cover
Source
Forest
Center for Watershed Protection 1998 (p.6-3)
Urban/Suburban Open Land
Center for Watershed Protection 1998 (p.6-3)
Low Density Residential (0.5 umts/acre)
NRCS - USDA 1986 as reported in Center for Watershed Protection 1998 (p. 6-7)
Low Density Residential (1 umts/acre)
NRCS - USDA 1986 as reported in Center for Watershed Protection 1998 (p. 6-7)
Medium Density Residential (2 umts/acre)
Medium Density Residential (3 umts/acre)
Medium Density Residential (4 umts/acre)
High Density Residential (5-7 umts/acre)
Multifamily Townhouse (>7 units per acre)
NRCS - USDA 1986 as reported in Center for Watershed Protection 1998 (p. 6-7)
NRCS - USDA 1986 as reported in Center for Watershed Protection 1998 (p. 6-7)
NRCS - USDA 1986 as reported in Center for Watershed Protection 1998 (p. 6-7)
Puget Sound - AquaTerra 1994 as reported in Center for Watershed Protection 1998 (p. 6-7)
NRCS - USDA 1986 as reported in Center for Watershed Protection 1998 (p. 6-7)
Commercial
NRCS - USDA 1986 as reported in Center for Watershed Protection 1998 (p. 6-7)
Parking - Unpaved
expert opinion of Lee Sutton, Georgia NEMO
Roads/Paved Parking
expert opinion of Lee Sutton, Georgia NEMO
Center for Watershed Protection. 1998. Rapid Watershed Planning Handbook
Total Economic Value
Total Economic Value
Direct Indirect Option Existence Bequest
Use Use Value Value Value
Use Value
Nonuse Value
Total Economic Value
Total Economic Value
Use Value Nonuse Value
Direct Use Indirect Use Option Value Existence Value Bequest Value
Development
Total Economic Value
Total Economic Value
Use Value Nonuse Value
Direct Use Indirect Use Option Value Existence Value Bequest Value
Greenspace for recreation
Total Economic Value
Total Economic Value
Use Value Nonuse Value
Direct Use Indirect Use Option Value Existence Value Bequest Value
Held for future use by self
Total Economic Value
Direct Indirect Option Existence Bequest
Use Use Value Value Value
Use Value
Nonuse Value
Held for future use by others
Total Economic Value
Total Economic Value
Direct Indirect Option Existence Bequest
Use Use Value Value Value
Use Value
Nonuse Value
Conserving
unique
natural
assets
Total Economic Value
Total Economic Value
Maximizing Value
Direct Indirect Option Existence Bequest
Use Use Value Value Value
Use Value
Nonuse Value
Capturing Value
“It's really pretty up here.”
“...earlier this year, recognized by the National Wildlife Federation recognized The Refuge as a certified wildlife habitat.”
“.the trees, the history behind it.”
“We fell in love with it.”
Economic Analysis
Revenues - Costs ^ Profits
Feature Effect: “All Other Things Equal”
Revenues Costs Profit
More efficient infrastructure Y Y
Less land to be cleared Y Y
Human use of green space Y Y
Identity: good stewards Y Y
Profit margin
Reduction in infrastructure costs
Economic Analysis
Reduction in clearing costs Market premiums
Economic Analysis
Reduction in clearing costs Market premiums
• Profit margin
• Reduction in infrastructure costs
Indicator Conventional Conservation New Urbanist Description
Cost to Develop Roads $4,894,062 ($5,113.96/DU*) $3,297,842 ($4,580.34/DU*) $5,102,438 ($5,445.50/DU*) Total road cost in each scenario based on widths and lengths of streets and a standard cost per square foot.
Cost to Develou Sewei $2,162,780 ($2,259.96/DU*) $1,858,892 ($2,581,79/DU*) $1,995,763 ($2,129.95/DU*) Total sewer cost of sewers in each scenario based on length of pipe estimated from road layout and a standard cost per linear foot.
Cost to Develou Water Lines $1,853,811 ($1,937.11/DU*) $1,593,336 ($2,212.97/DU*) $1,710,654 ($1,825.67/DU*) Total water line cost in each scenario based on length of pipe estimated from road layout and a standard cost per linear foot.
Economic Analysis
• Profit margin • Reduction in clearing costs
• Reduction in infrastructure costs • Market premiums
Indicator Conventional Conservation New Urbanist Description
Cost of Land Cleaiina $697,801 $292,222 $344,068 Total clearing costs in each scenario based on varying amounts of land cleared for different lot sizes and types and a standard cost to clear per acre.
Profit margin
Reduction in infrastructure costs
Economic Analysis
1 Reduction in clearing costs ' Market premiums
Economic Analysis
From gross sales revenue to potential net revenue, considering the following:
Reduction in clearing costs Market premiums
Profit margin
Reduction in infrastructure costs
Conventional Conservation New Urbanist
Potential Net Revenue
$38,986,928 $44,128,913 $46,111,922
Questions?
www.csc.noaa.gov/alternatives